New Primary School Bourne, Lincolnshire

This new two-form entry primary school at Bourne has been designed for maximum flexibility in use, with a fully integrated servicing and IT infrastructure, also has a framed structure to allow for easy future alteration of layout. The form and construction of the school are designed to minimise energy use and C02 emissions, both in construction and in use, maximising opportunities for daylight and controlled sunshine into all classrooms.